Epoxy Floor Coating Calculator: How Much Epoxy You Need, Coverage per Gallon, and Surface Prep

How many gallons and kits a floor takes, coat by coat, from the square footage and the product data sheet; what mils, solids, and square feet per gallon mean; which concrete surface profile each coating needs; and whether to grind or shot blast to get it. HTS Poly and Ameripolish epoxies, polyaspartics, and urethanes; grinders from 120-volt single-head to 30-inch propane planetary, shot blasters, and scarifiers in the rental fleet.

  • 1,604 sq ft·mil per gallon

    One gallon spread 1 mil thick covers 1,604 square feet. Every coverage number comes from this and the solids.

  • CSP 2–3

    The profile film-forming floor coatings ask for on bare concrete: a diamond grind or light shot blast. Acid etching doesn't get there.

  • 3 lb per 1,000 sq ft

    Maximum moisture vapor emission in 24 hours (ASTM F1869) before a standard epoxy goes down.

  • 28 days, 50–85°F

    Minimum concrete age, and the application window, with 20 to 60% humidity.

Estimate coating material

Enter the floor area, pick a primer, build coat, and topcoat by type, and get gallons and kits per layer, the film build, and what the system needs before the first coat goes down. Each type starts at a typical square-feet-per-gallon rate; type the number from your product's data sheet over it.

Estimate coating material

Primer, build coat, topcoat · gallons, kits, film build, and the prep the system needs

Each type starts at a typical rate. Type the number from your product's data sheet over it; the brand table below has the HTS Poly and Ameripolish figures.

What the system needs

    Material

    —gallons · — in typical kits

    —

    —coats total
    —dry film build, mils
    —system sq ft per gallon
    —gallons per coat, average
    LayerSq ft/galGalTypical kits
    —
    Send it to us

    Planning figure. Profile depth, porosity, temperature, and technique move real coverage 20% either way; kit sizes vary by brand, and the counter rounds to the product you order.

    Square feet per gallon by film thickness and solids

    Dry film in mils down the side, solids by volume across. Square feet per gallon = 1,604 × solids ÷ dry mils, no waste. Layers with a known solids figure are highlighted.

    Wet film is the dry film divided by the solids: a 50% solids coating at 4 dry mils goes on at 8 wet mils and covers 200 square feet per gallon.

    How coating coverage works

    A US gallon is 231 cubic inches. Spread 1 mil (one thousandth of an inch) thick, it covers 1,604 square feet. That single number turns any data sheet into gallons:

    Square feet per gallon = 1,604 × solids by volume ÷ dry film thickness in mils.

    A 100% solids epoxy laid at 10 mils covers 160 square feet per gallon, which is why HTS publishes 150 to 200 for EPX-100: 8 to 10.7 mils per coat. A urethane topcoat spread at 4 wet mils covers 400, which is the figure on the MCU sheet. A 20-mil vapor barrier coat is 80 square feet per gallon, and the EPX-MVB FS sheet says exactly that.

    Wet film is what you measure with a comb gauge as you roll; dry film is what's left after the solvent or water leaves. For 100% solids products they're the same. For a water-based epoxy or a urethane, the wet film is the dry film divided by the solids.

    The range on a data sheet is real. A CSP 3 shot-blasted floor has more surface than a CSP 2 ground floor and takes more material to fill the texture; a broom finish takes more still; a sanded recoat takes the least. Plan at the low end of the range for bare concrete and keep the high end for recoats. Sealers and penetrating products work the same way but on thinner or no film; they get their own pages.

    Coverage, pot life, and return to service by product

    The calculator works by type; this is where the brand numbers live. Figures from the HTS Poly and Ameripolish technical data sheets. Coverage is for bare prepped concrete; the second figure, where there is one, is for a recoat over an existing coating. Mils per coat are back-calculated with the 1,604 rule; "wet" marks products whose solids aren't published. Type the data-sheet rate into the calculator's square-feet-per-gallon field to estimate a specific product.

    Primers and vapor barriers

    ProductWhat it isSq ft/galMils per coatPot lifeRecoatTrafficSizes
    HTS PMR-100High-solids epoxy primer for porous or old concrete200–2506.4–8 wet30–40 min8 hfull cure 7 d1.5, 3 gal kits
    HTS EPX-MVB FS100% solids moisture vapor barrier epoxy, tested at 20 mils80–9018–2012–15 min3–6 h—1.5, 3 gal kits
    Ameripolish MVB89% solids moisture vapor barrier epoxy primer; CSP 3 minimum100 at 16 mils14 dry45 min working time6–12 h—3 gal kit

    Epoxy build and color coats

    ProductWhat it isSq ft/galMils per coatPot lifeRecoatTrafficSizes
    HTS EPX-100 HV100% solids high-viscosity epoxy, the build coat under a topcoat or on its own150–2008–10.730–40 min8 hfoot 16 h, heavy 48 h, full 7 d1.5, 3 gal kits
    HTS EPX-60 WBWater-based epoxy for occupied buildings; under 50 g/L VOC200–2506.4–8 wet45–50 min10–24 hfoot 16 h, full 5–7 d1, 4 gal kits

    Topcoats

    ProductWhat it isSq ft/galMils per coatPot lifeRecoatTrafficSizes
    HTS PAS-100100% solids aliphatic polyaspartic, fast; UV stable, interior and exterior150–200 (recoat 200–250)8–10.710–15 min8 hfoot 4–6 h, full 24 h1.5, 3 gal kits
    HTS PAS-200Same chemistry with working time for larger floors150–200 (recoat 200–250)8–10.712–18 min8 hfoot 10–12 h, full 48 h1.5, 3 gal kits
    Ameripolish Polyaspartic 85High-solids polyaspartic topcoat, clear or colored; 6–12 mils, 15 max125–2506–1230–45 minwhen tack-freefoot 2–4 h, vehicles 24–48 h2, 10 gal kits
    HTS MCU-HG / MCU-MTOne-component moisture-cure aliphatic urethane, gloss or matte, clear or color pack; 4 mils max per coat400–500 (recoat 600–700)≤4 wet40–45 min10–30 h—1 gal

    This page is conformal coating systems. Acrylic and penetrating sealers for driveways, pool decks, and broom-finished or stamped concrete (HTS CS-AC30, Ameripolish X-Link, DNS-400, AquaShield) are on the exterior coatings page; densifiers, stain protectors, guards, and dyes are on the polished concrete page. Conditions common to these coatings: concrete at least 28 days old; moisture vapor under 3 lb/1,000 sq ft/24 h (ASTM F1869) or 5% on a meter; 50 to 85°F and 20 to 60% humidity; no wet cleaning the day of. Pot life and cure are at 72 to 77°F.

    Typical systems

    FloorSystemBuildNotes
    Garage, shop, showroomEPX-100 HV + PAS-100 or PAS-200, or + Polyaspartic 85~18–20 milsEpoxy for build and bond, polyaspartic for UV, hot tires, and chemical resistance.
    Warehouse, light industrial, fast returnPMR-100 + EPX-100 HV, or two coats of EPX-100 HV~18–22 milsPrimer when the slab is porous or old; forklift traffic at 48 hours.
    Slab that fails the moisture testEPX-MVB FS or Ameripolish MVB + EPX-100 HV + topcoat~36–40 milsThe vapor barrier coat is the budget: 80 to 100 square feet per gallon. Ameripolish MVB wants CSP 3.
    Occupied building, low odorEPX-60 WB × 2, or EPX-60 WB + MCU topcoat~8–12 milsWater-based, under 50 g/L VOC; a finish, not a repair.

    How much epoxy for a garage floor

    The usual system: one coat of 100% solids epoxy at 160 square feet per gallon under one coat of polyaspartic at 225, with 10% waste, on bare ground concrete. Run your own footage through the calculator above; a porous slab, a step, or an island changes it.

    FloorSq ftEpoxyPolyasparticTotalTypical kits
    1-car garage2501.7 gal1.2 gal2.9 galEpoxy 1 × 3 gal · polyaspartic 1 × 1.5 gal
    2-car garage4403.0 gal2.2 gal5.2 galEpoxy 1 × 3 gal + 1 × 1.5 gal · polyaspartic 1 × 3 gal
    3-car garage6504.5 gal3.2 gal7.6 galEpoxy 1 × 3 gal + 1 × 1.5 gal · polyaspartic 1 × 3 gal + 1 × 1.5 gal
    24 × 36 shop8645.9 gal4.2 gal10.2 galEpoxy 2 × 3 gal · polyaspartic 1 × 3 gal + 1 × 1.5 gal
    30 × 40 shop1,2008.3 gal5.9 gal14.1 galEpoxy 3 × 3 gal · polyaspartic 2 × 3 gal
    Small warehouse bay2,50017.2 gal12.2 gal29.4 galEpoxy 6 × 3 gal · polyaspartic 4 × 3 gal + 1 × 1.5 gal

    Kits shown are the common 1.5 and 3 gallon sizes. Two coats of epoxy and no topcoat is about the same material; a vapor-barrier primer roughly doubles it.

    Polyaspartic vs epoxy

    Most floors get both: epoxy underneath because it wets into the concrete, builds thick, and is cheaper per mil; polyaspartic on top because it doesn't yellow, shrugs off hot tires and chemicals, and reopens the floor the same day. The questions are which one goes where, and whether one of them can do the whole job.

    100% solids epoxy (EPX-100 HV)Polyaspartic (PAS-100, PAS-200, Polyaspartic 85)
    Build per coat8–11 mils; self-levels into the profile6–12 mils; thin and fast, 15 mils max
    Pot life at 72°F30–40 minutes10–15 minutes (PAS-100), 12–18 (PAS-200), 30–45 (Poly 85)
    Return to serviceFoot traffic 16 h, heavy 48 h, full cure 7 daysFoot traffic 2–6 h, vehicles 24–48 h
    UVAmbers and chalks in sunlight; keep it under a topcoat near doorsAliphatic: stays clear and colorfast outdoors
    Hot tires, chemicalsGood; hot-tire pickup is the classic failure of thin epoxyBetter; the reason it's the topcoat
    Bond to bare concreteExcellent; the primer of choiceGood; HTS prefers an epoxy primer under it for build and adhesion
    Working temperature50–85°F50–85°F; cold slows it, heat shortens an already short pot life
    Cost per milLowerHigher
    Use it alone whenInterior, no direct sun, budget floor, forklift warehouse that can wait 48 hoursFast turnaround, exterior or sun exposure, thin decorative system over sound concrete

    Surface profile: which CSP the coating needs, and which machine makes it

    ICRI's Concrete Surface Profile scale runs from 1 (nearly flat, acid-etched) to 10 (exposed coarse aggregate). Thin coatings need a fine profile so they don't bridge peaks and leave pinholes; thick coatings and overlays need texture to key into. Every HTS floor coating specifies CSP 2–3 on bare concrete, which is the range a diamond grinder or a light shot blast produces. Under a film-forming (conformal) coating, acid etching is not a substitute: it leaves CSP 1, no mechanical key, and salts in the pores unless it is neutralized and rinsed completely, which then means a wet slab. Etching does have a place under penetrating and semi-penetrating products: water repellents, penetrating sealers, stains, and guards on dense troweled concrete, where the job is to open the pores rather than cut a key. Those products, and the chemical etchers made for them, are on the exterior coatings and polished concrete pages.

    CSP 1CSP 2CSP 3CSP 4CSP 5CSP 6CSP 7CSP 8CSP 9CSP 10
    acid etchgrindlight shot blastmedium shot blastmedium-heavy shot blastheavy shot blastheavy scarifyscabbleheavy scabbleexposed aggregate

    Highlighted: the range the coatings on this page call for.

    By coating thickness (ICRI 310.2R)

    Coating or overlayDry filmCSP
    Sealers0–3 mils1–3
    Thin-film coatings4–10 mils2–4
    High-build coatings10–40 mils3–5
    Self-leveling toppings50 mils–1/8"4–6
    Polymer overlays1/8"–1/4"5–9

    The coating data sheet governs where it names a number; HTS names CSP 2–3 for everything on this page.

    By preparation method

    MethodCSP producedRent it
    Acid or chemical etching1Not under a conformal coating. Acceptable before penetrating sealers, water repellents, stains, and guards where their data sheets allow it
    Diamond grinding1–3Planetary grinders from 120 V single-head to 30" 480 V and propane machines, with 16–30 grit metal-bond tooling; 7" edger for the perimeter
    Shot blasting2–9 by shot size and speedWalk-behind shot blaster; fastest prep on open floors
    Scarifying4–9Scarifier with carbide cutters; coating removal and heavy profile
    Scabbling / needle scaling5–9Pneumatic; patches and edges
    Water jetting3–10Specialty contractor

    Pair any dry method with a HEPA extractor; OSHA Table 1 requires it indoors.

    Grinder or shot blaster

    Both reach CSP 2–3. They get there differently, and the floor usually decides.

    Diamond grinderShot blaster
    ProfileCSP 1–3 by tooling: 16–30 grit metal-bond for CSP 2–3, finer for a polishCSP 2–9 by shot size and travel speed; CSP 3 is the natural result
    What it removesThin coatings, sealers, curing compound, paint, laitance, high spots. Thick or gummy coatings load the toolingLaitance, curing compound, light coatings. Thick coatings and mastics gum up the shot; scarify those first
    FlatnessFlattens: knocks down ridges and trowel marks, which a thin coating will otherwise telegraphFollows the floor; a wavy slab stays wavy
    Edges and cornersTo within 1/4" with a 7" edgerLeaves a 2–4" band at walls and columns that still needs the grinder
    Surface it leavesSmooth and uniform; on hard, steel-troweled slabs it can polish instead of profile unless the tooling is coarse enoughUniform open texture that coatings key into; shot lines can show through thin clear sealers
    DustDry with a HEPA extractor (OSHA Table 1); wet grinding is an option on exterior workClosed loop: the shot is recycled and the dust goes to the attached collector
    Consistency and skillForgiving. The profile comes from the tooling grit and the number of passes, so two operators get the same floor. The mistakes are dwelling in one spot, which leaves swirl marks, and tooling too fine for a hard slab, which polishes instead of profilesOperator-dependent. Travel speed, shot flow, shot size, and pass overlap all set the profile. Rows that don't overlap evenly leave "cornrows" (tiger stripes) that telegraph through a light coating; too slow or stopped with the shot on cuts a deeper band; a damp slab or gummy coating clogs the shot. Overlap passes about 50%, keep the speed constant, and run a test patch first
    SpeedSlower per pass; usually two passesFastest prep per square foot on open floors, once the operator has the settings dialed in
    Power and access120 V single-head machines for small rooms and garages; planetary machines up to 30" wide on 480 V three-phase or propane for open floors. Propane runs where there's no power, with ventilation230 or 480 V three-phase, or gas; needs a straight run and room to turn
    Choose it forGarages, small rooms, floors with old coatings or sealers, slabs that need flattening, thin coatings and clear sealers; with a 30" planetary machine, open floors tooLarge open warehouses and shops, high-build or vapor-barrier systems that want CSP 3, floors with no coating to remove

    Most big jobs use both: the blaster for the field, the grinder and edger for the perimeter, columns, and anything the blaster won't fit. A thick old coating or mastic gets a scarifier first, then a grinder to take the ridges down to CSP 3; scarifying alone leaves too rough a surface for a 10-mil coating.

    If the crew hasn't run a shot blaster before, the grinder is the safer rental: it is slower, but the result doesn't depend on walking speed, and a grinder pass can also fix a blasted floor that came out striped. A blaster earns its speed on long open runs where the operator can hold one speed and one overlap from wall to wall.

    Moisture, temperature, and the recoat window

    Moisture is what kills epoxy floors. Test every slab: calcium chloride (ASTM F1869) under 3 lb per 1,000 square feet in 24 hours, or in-slab relative humidity (ASTM F2170). Over that, the system starts with a moisture vapor barrier epoxy, tested at 16 to 20 mils, or the floor waits. New concrete needs 28 days minimum. Don't wet-clean a floor the day it's coated; the data sheets say so for every product.

    Temperature runs 50 to 85°F for every HTS coating, slab and air, with humidity between 20 and 60%. Pot life is quoted at 72°F: PAS-100 at 10 to 15 minutes means mix one kit at a time and have the roller moving. Cold stretches every cure time on the table above; a 50°F slab can double them.

    Recoat windows are the time after which the next coat still bonds chemically: 8 hours for the epoxies and polyaspartics, 10 to 30 hours for the urethanes. Past the window, sand with 120 to 220 grit, vacuum, and keep going. Plan the layers so each coat lands inside the previous one's window and the job finishes in a day or two instead of a week of sanding.

    Questions we get at the counter

    How much epoxy do I need for a 2-car garage?

    Call it 440 square feet. One coat of 100% solids epoxy at 150 to 160 square feet per gallon is about 3 gallons with waste: a 3-gallon kit plus a 1.5. A polyaspartic topcoat at 200 to 225 is another 2.2 to 2.4 gallons, so a 3-gallon kit. Run your own footage through the calculator; islands, a step, and a porous slab all change it.

    Do I need a primer?

    On a sound, dense, ground slab a 100% solids epoxy bonds without one. Prime with PMR-100 when the concrete is porous, old, or dusty, when you want a higher build without a third coat of EPX-100, or when you're not sure. A vapor barrier primer is a different decision, made by the moisture test, not by preference.

    Can I coat over the old epoxy?

    If it's bonded (it doesn't flake at a scored X or lift under tape), sand it with 120 to 220 grit, vacuum, solvent-wipe, and coat; use the recoat coverage figure. If it's peeling anywhere, it's coming off everywhere eventually: grind or scarify it to bare concrete and start at CSP 2–3.

    Can I just acid etch instead of grinding?

    Not under these coatings. Etching leaves CSP 1 with no mechanical key, doesn't remove curing compound or sealers, and leaves salts in the pores unless it's neutralized and rinsed perfectly, which then means a wet floor. A rental grinder does a garage in a morning and the coating stays down.

    How soon can I drive on it?

    PAS-100: foot traffic in 4 to 6 hours, full cure in 24. PAS-200: 10 to 12 hours and 48. EPX-100 HV: foot traffic in 16 hours, heavy traffic at 48, full cure at 7 days. Hot tires and a wet slab are the two things that lift a new floor; give it the full cure before parking a car that just came off the highway.

    What grinder do I rent for a garage?

    A walk-behind planetary grinder with 16 to 30 grit metal-bond diamonds, a HEPA extractor, and a 7-inch edger with a cup wheel for the walls and corners. It takes off the old sealer and profiles the slab in the same passes. Rent the three together and the tooling comes with it.

    How much does it cost to epoxy a garage floor?

    Doing it yourself, the cost is the material by the kit, the grinder rental for a day, and the tooling. Send the footage and the system through the form and the quote comes back with both. A contractor's price adds labor and margin on top; the material and prep are the same.

    Send us the footage and the system

    Paste the estimate and tell us the floor, the finish, and the date. We'll quote the material by the kit and the grinder or shot blaster to prep it, on one order from Newport News or Chesapeake. Or call (757) 249-1111, 6:30am to 4:30pm Monday through Friday.